Local

Anthony Wayne Bridge construction

CTY-hilevel27p-Jason-Harris

Jason Harris, of Oregon, and Kamarr Holloway, of Toledo, at work on the west side tower of the bridge. They are replacing batten plates as needed.

The Blade/Jetta Fraser
Buy This Image

CTY-hilevel27p-Stierhoff

Tammy Stierhoff, of Bellevue, left, and Eric Johnston, of Norwalk, bind bridge railing that have been cut from the sides of the bridge.

The Blade/Jetta Fraser
Buy This Image

CTY-hilevel27p-Gerken

Gaken Gerken, of Napoleon, left, and Matt Pierson, of Oak Harbor, with a section of the pedestrian railing that is removed by an excavator operated by Dan Newton, of Curtice [not pictured].

The Blade/Jetta Fraser
Buy This Image

CTY-hilevel27p-pedestrian-railing

Eric Johnston, of Norwalk, de-burring the cut ends of sections of the pedestrian railing.

The Blade/Jetta Fraser
Buy This Image

CTY-hilevel27p-Anthony-Wayne-Bridge

Looking east from the Anthony Wayne Bridge in Toledo.

The Blade/Jetta Fraser
Buy This Image

CTY-hilevel27p-excavator

A section of the pedestrian railing is removed by an excavator operated by Dan Newton, of Curtice.

The Blade/Jetta Fraser
Buy This Image

CTY-hilevel27p-Route-2

Looking east from the Anthony Wayne Bridge in Toledo.

The Blade/Jetta Fraser
Buy This Image

CTY-hilevel27p-High-Level-Bridge

A modular expansion joint that will be installed as part of the re-construction of the bridge. The label indicates it was made specifically for the High Level bridge.

The Blade/Jetta Fraser
Buy This Image

CTY-hilevel27p-Modular

Modular expansion joints that will be installed as part of the re-construction of the bridge.

The Blade/Jetta Fraser
Buy This Image

Click to comment